Free Industrial AI Audit

Is Your Facility One Failure Away
From a Crisis?

We evaluate five risk areas specific to facilities with legacy equipment and aging control systems — and deliver a scored action plan ranked by urgency, with a direct call from a real engineer.

FREE — No Obligation

What We Evaluate

Five Risk Areas.
One Honest Assessment.

1
Equipment Lifecycle Risk

We assess the age, condition, and replaceability of your critical controllers, PLCs, and HMIs. Many facilities are running on hardware that is 20–30 years old with no replacement parts available anywhere. We score how exposed you are to a parts-unavailable shutdown.

2
Security Posture

Legacy industrial systems were designed before cybersecurity was a concern. We evaluate your OT network architecture, remote access points, and exposure to internal and external threats. Critical infrastructure is a high-value target — we tell you how hard you are to hit.

3
Documentation Gaps

Can your team restore operations after a failure without calling someone who may no longer be available? We evaluate the completeness of your wiring diagrams, parameter backups, G-code libraries, PLC programs, and operator procedures — and identify what’s missing.

4
Knowledge Retention Risk

How much critical operational knowledge exists only in the heads of 1–2 employees? We score your institutional knowledge risk and identify which areas are most vulnerable to retirements, resignations, or unexpected absence.

5
Automation & AI Readiness

Where is your facility still running manual processes that create bottlenecks, errors, or safety risks? We identify which operations are candidates for automation or AI-assisted monitoring — and what infrastructure changes are needed first.

Request Your Free Assessment

Fill out this form. We review your responses and schedule a 30-minute call with a Cloud-Free-Industrial engineer within 1 business day.

We respond within 1 business day. No automated reply — a real engineer reads every form.

What You Get

Your Assessment Deliverables

Three concrete outputs you can act on immediately, even if you never hire us.

Risk-Scored Report
A PDF scoring your facility across all five audit areas with a severity rating (Low / Medium / High / Critical) for each risk category and an overall risk score.
Prioritized Action Plan
A ranked list of the most urgent improvements — starting with the ones that could cause an unplanned shutdown if not addressed, with rough cost estimates for each.
30-Minute Results Call
A direct conversation with a Cloud-Free-Industrial engineer to review your results, answer questions, and recommend the right starting point for your situation.